A HISTORIC MILESTONE IN THE SYRIAN MARKET

Installation requirements for the bottom of the pigtail channel

Installation requirements for the bottom of the pigtail channel

Ensure the channel is fastened to sound structure, structural steel studs shall be a minimum 33mil (20ga) CP60 as required by AISI S240-20. The de-signer of record shall determine the framing system required to meet the project load conditions (wind, rain, seismic, etc. That short conductor is the pigtail, and its presence reflects one of the most important principles in residential electrical work: keeping the circuit continuous and reliable regardless of what happens at any single device. Let's begin the process: Step 1: Turn Off the Power Supply Turn off your switchboards for safety, as kids can be around doing electrical tasks. Put your breaker at rest to avoid any short circuit or mishap in the area where you are working. A pigtail connection is simply a short piece of insulated electrical wire, typically six to eight inches long, used to bridge different conductors within a box. Electricians favor this method because it isolates individual devices while protecting entire circuits.

Read More
Syrian fiber optic cold splice 24 cores

Syrian fiber optic cold splice 24 cores

24 Core IP68 Inline Splice Enclosure with 2 x 12 Way Splice Trays (210 x 400 x 150) The inline enclosure is suitable for protecting fibre cable splices in straight through and branching applications. Its well-engineered, injection moulded outer body makes it impenetrable to the. The product provide with six fiber cable in-out round ports and the cable diameter is from Ф10-Ф23. This product is made from the high-quality and with the mechanical sealing structure filled with the sealing material. Telecommunication Equipment Waterproof Splice Closure is designed for configuration flexibility, these closures offer expanded slack storage, various tray heights and mass platform storage. It is made of tough chemical resistant engineering material which effectively prevents it from ageing caused by heat, cold, oxygen and UV radiation.

Read More
Syrian Multimode Fiber Optic Transceiver

Syrian Multimode Fiber Optic Transceiver

Syria Launches "Barq Net" Project to Expand Nationwide Fiber Optic Infrastructure ⚡ In a bold step toward full digital transformation, the Syrian Ministry of Communications and Technology has officially launched the "Barq Net" initiative, an ambitious national project to deliver. The BARQ NET FTTP initiative represents Syria's comprehensive fiber-to-the-premises infrastructure deployment across all 14 governorates: Damascus, Aleppo, Homs, Latakia, Hama, Tartus, Deir ez-Zor, Ar-Raqqah, Al-Hasakah, Daraa, Idlib, As-Suwayda, Quneitra, and Rif Dimashq. Syria's government is negotiating with leading Gulf telecom operators—Zain, Etisalat, STC, and Ooredoo—for a $300 million project named SilkLink, aimed at modernizing the country's fibre optic communications infrastructure. Fibre optics are essential for Syria's future, significantly impacting connectivity and development. This section explores how high-speed internet can boost the economy and improve social and cultural aspects. The project, described by the government as a cornerstone of its digital infrastructure. Market Forecast By Form (SFF and SFP, SFP+ and SFP28, QSFP, QSFP+, QSFP14, QSFP28, CFP, CFP2), By Data Rate (Less Than 10 GBPS, 10 GBPS to 40 GBPS, 41 GBPS to 100 GBPS, More Than 100 GBPS), By Distance (Less Than 1 KM, 1 to 10 KM, 11 to 100 KM, More Than 100 KM), By Wavelength (850 NM Band, 1310 NM.

Read More
Cable trench at the bottom of the distribution box foundation

Cable trench at the bottom of the distribution box foundation

The ICP must lay 11kV (and below) cables directly onto the bottom of the trench. Where a sand bedding material is required for the base of a trench the ICP shall then excavate the trench depth an additional 75mm and install sand to a finished compacted depth of 75mm. om must be free of stones, loose earth (including scuffed material) and sharp objects. In backfilled areas, the trenc bottom must be compacted to the satisfaction of ATCO's Electricity Representati The trench bottom must also be kept level, to facilitate the laying-in of the cable. - The foundation steel and cable trench under the cabinets, stands, and boxes should be inspected and qualified, and the foundation and embedded conduits for floor-standing cabinets, stands, and boxes should be accepted as qualified. The ICP must excavate all trenches and joint holes to the dimensions, appropriate for the type and quantity of apparatus to be installed, as detailed in Section 3.

Read More
Fixing bracket on the back of the distribution box

Fixing bracket on the back of the distribution box

Simply slide the bracket to the width required and snap both ends of the bracket to the stud and secure with screws. Plus, the BBA and BBA-4 box mounting brackets easily snaps onto the BBT-HF bracket and accepts 4", 4-11/16" and 5" electrical box sizes. With this structure, we can install the componets of irregular heights easier and faster. They are available in different shapes depending on where they are mounted and the objects they hold. The RSWB simply adjusts to fit between uprights in wood or metal partition walls. 【Durable Back Box Saver for Long-Term Stability​】Switch Socket Screw Hook is made of high quality materiel.

Read More

Get In Touch

Connect With Us

📱

Spain (Sales & Engineering HQ)

+34 910 257 483

📍

Headquarters & Manufacturing

Calle de la Innovación 22, 28043 Madrid, Spain