UNDERGROUND ELECTRIC DISTRIBUTION CONSTRUCTION
be done without the specific permission of the Engineer. The use of vibratory pile drivers shall be limited to that sheet piling driven no greater than five (5) feet below the bottom of the structure or duct bank.